Noseri Lake or Neelum Jhelum Hydropower Plant:

The Neelum–Jhelum Hydropower Plant was part of a run-of-the-river hydroelectric power scheme in azad Kashmir Pakistan, designed to divert water from the Neelum River to a power station on the Jhelum River. The power station is located 42 km (26 mi) south of Muzaffarabad, and has an installed capacity of 969 MW. Construction on the project began in 2008 after a Chinese consortium was awarded the construction contract in July 2007.